Minor Works Building Contract for use in Scotland (Nov 2011)

Appropriate:

  • where the work involved is simple in character;
  • where the work is designed by or on behalf of the Employer;
  • where the Employer is to provide drawings and/or a specification and/or work schedules to define adequately the quantity and quality of the work; and
  • where a Contract Administrator is to administer the conditions.
  • where bills of quantities are required;

Can be used by both private and local authority employers.
Not suitable :

  • where provisions are required to govern work carried out by named specialists;
  • where detailed control procedures are needed;
  • where the Contractor is to design discrete part(s) of the works, even though all the other criteria are met - consider the Minor Works Building Contract With Contractor's Design (MWD)

Also please see Amendments from April 2007 and Amendments from October 2007

Create document online

This document costs £34.67

Subscribers can download this document by logging in here
(How to subscribe)

Buying a paper copy of this document

Click here to purchase paper copies of SBCC documents

Joint Contracts Tribunal

Log in


Forgotten password?